want free jegs gear?

Comment on any of our posts with your expertise and we'll send you a bag of JEGS schwag.

Learn More >

Installation Instructions for 15352 Replacement Sending Unit for GM 0-90 Ohm Gauge 

Installation Instructions: 

1. The center stud/nut on the sending unit is to be connected to the hot wire for the gauge. 

2. The male spade terminal toward the outside of the sending unit is to be connected to chassis ground. 

3. The silver screw is ONLY utilized in applications where the gauge requires a separate ground connection.

Customer q:

CAR MAKE & MODEL

JEGS ANSWER:

No items found.

car specs

social media

exterior modifications
interior modifications
PERFORMANCE/HANDLING MODIFICATIONS
Posted on
May 10, 2018
in
Instruction Guides
category

Psst! Want a chance to win FREE SCHWAG? Comment on this post and click here for details on the JEGS Comment Contest >

You Might Also Like

Follow us on Instagram to get notified about new products and discounts

Follow Us